Project Newsletter | Hengdian Group East Magnetic Co., Ltd. has a new high-performance lithium battery project with an annual output of 6GWh, and our company's products are used

Project Introduction:

Hengdian DMC plans to invest in a new high-performance lithium battery project with an annual output of 6GWh in the East Magnetic High-tech Industrial Park, Hengdian Town, Dongyang City, Zhejiang Province. The total investment of the project is estimated at 1.833 billion yuan, of which the investment in fixed assets is about 1.433 billion yuan, and the working capital is about 400 million yuan. At the same time, Jiangsu DMC, a subsidiary of Hengdian DMC, plans to invest in a new high-efficiency module project with an annual output of 2.5GW in Sihong County, Jiangsu Province, with a total investment of 339 million yuan, including about 165 million yuan in fixed assets and 174 million yuan in working capital. In addition, Hengdian DMC plans to invest in an annual output of 15,000 tons of soft ferrite project in Hengdian Town, Dongyang City, Zhejiang Province, with a total investment of 513 million yuan, including about 333 million yuan in fixed assets and about 180 million yuan in working capital, and it is expected to add 15,000 tons of soft ferrite production capacity after the project is completed and fully completed. At the same time, Hengdian DMC plans to set up a subsidiary with DMC New Energy in the Guangdong-Guizhou Cooperation Special Pilot Zone in Wuzhou, Guangxi Province and invest in a permanent magnet ferrite project with an annual output of 22,000 tons. The total investment of the project is estimated at 124 million yuan, of which the investment in fixed assets is about 90 million yuan, the working capital is about 34 million yuan, and it is expected to add 22,000 tons of permanent magnet ferrite after all are put into production. In addition, Hengdian DMC plans to invest in a new high-efficiency integrated inductor project in Hengdian Town, Dongyang City, Zhejiang Province, with a total investment of 1.118 billion yuan, including about 778 million yuan in fixed assets and about 340 million yuan in working capital, and it is expected to add 5.12 billion inductors after the project is completed and fully put into production.

The project adopts our company’s BKS reactive power compensation device:

Product Introduction

The BKS series filter compensation assembly is composed of low-voltage power capacitors and filter reactors, which are specially designed for reactive power compensation and filtering of harmonic pollution distribution systems.

Key Benefits:

 •Reasonable capacitor and reactor configuration can achieve the purpose of compensating reactive power and filtering out some harmonics at the same time

 •Low-voltage power capacitors with higher rated voltage: 480V capacitors are used for 7% BKS series compensation filter components, and 525V capacitors are used for 14% BKS series compensation filter components, which are more stable and reliable in 400V power distribution system

  • Filter reactor with H-class insulation, pure copper winding, low power consumption and high reliability
  • The installation layout in the cabinet is autonomous, and other auxiliary devices are configured by themselves, and the selection is flexible

Applications

BKS series filter compensation components are suitable for power distribution systems where reactive power changes are not frequent.

 •BKS series filter compensation components with reactance rate of 7% and tuning frequency of 189Hz can effectively suppress harmonic pollution of 5th order and above while providing reliable reactive power compensation.

 •BKS series filter compensation components with reactance rate of 14% and tuning frequency of 134Hz provide reliable reactive power compensation while effectively suppressing harmonic pollution of the 3rd order and above.

Share:

More Posts

Send Us A Message

Translate »